Discovery
We map your service area, average ticket and growth goals on a focused intake call.
Creative, campaigns, landing pages, CRM, AI follow-up, appointments, and revenue — built into one Meta Ads growth system.
Trusted by home-service brands across the country
Green City doesn't just generate leads — we build the system that turns them into booked revenue. Follow one ad impression down all eight stages, from a thumb-stop to a tracked, closed job.
Thumb-stopping creative hits a high-intent local audience.
They tap through to a fast, conversion-built landing page.
Name, number and job request land in the CRM instantly.
AI follow-up filters tire-kickers and confirms real intent.
A site visit drops straight onto the crew's calendar.
Your team walks the job and sends a same-day estimate.
Contract signed. The crew is dispatched and the job is on.
Ready to plug your business into the full lead-to-revenue system?
BUILD MY GROWTH SYSTEMTwelve moving parts — ads, creative, landing pages, lead capture, CRM, AI follow-up, booking and tracked revenue — wired into one machine, purpose-built for home-service brands. Not twelve disconnected tools. One operating system.
THE GREEN CITY OPERATING SYSTEM
We build it, run it and optimize it — so you stay on the tools, not buried in dashboards. You just watch booked jobs land in your calendar.
Twelve moving parts. One operating system. Built, run and optimized by Green City.
HOW WE ONBOARD
From first call to live campaigns — one clear, accountable path every home-service client moves through. No black boxes, no guesswork. Eight stages, one growth system.
We map your service area, average ticket and growth goals on a focused intake call.
We pull your numbers — close rate, CAC, capacity — and find where money is leaking.
We sharpen your offer and seasonal hooks so the right homeowners say yes faster.
We script and shoot thumb-stopping ad creative — real jobs, real crews, real proof.
Landing pages, forms, tracking and CRM wired into one measurable lead pipeline.
Meta campaigns go live with clean structure, pixels firing and budgets dialed in.
Every lead is texted in seconds and nurtured by AI follow-up until it’s booked.
We scale winners, kill losers and report tracked revenue — every single week.
Every lead, dollar, appointment and follow-up — measured in one place, optimized in real time. This is the dashboard behind every home-service campaign we run.
Everything ConnectedEverything MeasuredEverything Optimized
Hi Sarah! This is Mike with ABC Roofing — got your request for a free roof inspection. Can I please have your zip code?
AI texted Sarah · 4m77096
Sarah replied · 4mGreat — we have a technician in your area on Tuesday. Does a 2:00–4:00 PM arrival window work for you?
AI · 3mYes please — Tuesday afternoon works.
Sarah replied · 2mAmazing. May I please have your full address, phone number and email?
AI · 2m5432 Willowbend Blvd, Houston, TX 77096 · (713) 555-0192 · [email protected]
Sarah replied · 1m✓ Booked estimate — Tuesday 2:00–4:00 PM. Calendar updated & crew notified.
AI · just nowPeople · Process · Tech — one system, fully managed
93% of booked estimates show up
Looker Studio · live reporting
One system, no blind spots — ads, CRM, calendar and AI follow-up wired together so no lead, dollar or appointment ever slips through the cracks.
Get your own command center — every lead, call and booked job in one place.
GET MY COMMAND CENTERYOUR GROWTH STACK · FULLY MANAGED
We don’t just hand you logins. Our team operates your entire growth stack — ads, tracking, CRM, automation and booking — so every lead is captured, worked and booked. These are the platforms we run for our clients, every day.









One team, one stack, one accountable system — so nothing slips through the cracks.
Every tool above, set up and run for you — nothing left on your plate.
HAVE IT RUN FOR MEREAL RESULTS · LIVE AD ACCOUNTS
Real campaigns, real spend, real leads — pulled straight from the Meta Ads Manager across our home-service clients. Not a designed graphic in sight.
Every screen above is a live Meta Ads Manager view — real spend, real leads, real campaigns.
Want numbers like these on your own ad account?
GET RESULTS LIKE THESEEvery Meta ad type, matched to the right stage of the home-service buyer journey — from the first cold scroll to the homeowner who’s ready to book.
A native instant form opens inside Facebook or Instagram — pre-filled with the homeowner’s name, email and phone. Zero friction, zero page load.
One tap opens Messenger or Instagram DMs. Our AI assistant qualifies, answers and books — turning a scroll into a real two-way conversation in seconds.
Still thinking about that new roof? Your free inspection is held for 48 hours. ⏳
SAVED FOR YOU
Homeowners who clicked, watched or started a form — but didn’t book — see a tailored follow-up that pulls them back to the finish line.
Watch a full kitchen transformation in 30 seconds — from demo day to reveal. ⚡
0:30
Cinematic before-and-afters, real crews and on-camera reviews stop the scroll and build trust before a homeowner ever fills a form.
$500 off any garage door install this month — plus a free smart opener. 🎉
LIMITED · ENDS JUN 30
A clear, time-boxed incentive — dollars off, free add-on, seasonal tune-up — that gives fence-sitters the reason to book now, not later.
Six formats, one job — booked estimates. We run the right mix for your trade, season and budget.
Instant in-app capture — lowest cost per lead.
CAPTUREPre-qualified, high-ticket bookings.
CONVERTReal conversations that book in chat.
ENGAGEWin back the warm leads who hesitated.
RECOVERCinematic proof that stops the scroll.
TRUSTTime-boxed deals that force the decision.
CLOSECREATIVE THAT CONVERTS
The exact ad creative we produce and run for home-service brands — by trade, pulled from the last six months. Pick an industry and press play.
96 real campaigns across 12 trades — produced in-house and running on Meta right now.
Get scroll-stopping creative built to book jobs — not win awards.
GET CREATIVE THAT CONVERTSWHY GREEN CITY
Most agencies hand you clicks and a confusing dashboard. We own the full path from ad to booked, paying customer — strategy, creative, ads, landing pages, CRM and AI follow-up wired into one growth operating system you can actually see working.
HVAC, roofing, remodeling, fencing, solar — we speak your trade and your buyer.
9 TRADES SERVEDAd to landing page to CRM to booked job — one accountable team, no hand-offs.
END-TO-ENDScroll-stopping creative, tuned Meta campaigns and a CRM that never drops a lead.
ONE STACKSpeed-to-lead texts and calls in seconds, 24/7 — every inquiry worked until it books.
< 60S REPLY250+ HOME-SERVICE BRANDS OPERATING
Leads, booked jobs and revenue in plain numbers — not vanity impressions or guesses.
REVENUE-LEVELWe optimize for jobs on the calendar, not form fills that never call back.
BOOKED > CLICKSEvery dollar is judged on return — we chase profitable jobs, not cheaper clicks.
ROI-FIRSTNo recycled template strategy — a system built around your market, margins and capacity.
BUILT FOR YOUOne team. One system. From the ad to the booked, paying customer.
Stop renting clicks. Own the system that turns ad spend into booked revenue.
BUILD MY SYSTEMPick the level of system you want behind your business. Every package is a real growth engine wired ad → booked job — not a media-buying retainer that hands you clicks and a confusing dashboard.
Get the system live
Accelerate booked jobs
Own your market
Slide your average job value — watch the system project a typical 90-day return on the Growth package.
More leads. More appointments. More growth. Not sure which level fits? Book a strategy call — we’ll map the right system for your market in 30 minutes, no pressure.
SOCIAL PROOF
A live wall of real home-service campaigns — the brands, the budgets and the booked-job numbers behind every result on this page.
Fencing
HVAC
HVAC
Air Quality
Garage
Construction
Insulation
Real campaigns, real revenue. Your brand belongs on this board next.
Eight non-negotiables behind every campaign, every dollar and every follow-up. Select a principle to see exactly what it means for your booked jobs.
We don't boost posts and hope. Every campaign starts from your real numbers — average job value, close rate, service radius — then we reverse-engineer the exact ad spend that hits your revenue goal.
You see what we see. One live dashboard shows spend, leads, cost-per-lead and booked revenue in real time — no curated screenshots, no "trust us," no hidden agency markup on your ad budget.
We tie our work to your outcome, not our hours. If a campaign underperforms, we say so first and fix it on our clock. The relationship is judged on booked jobs and tracked revenue — full stop.
Opinions lose to evidence. We run structured A/B tests on creative, hooks, audiences and offers, then scale only what proves out. Conversion tracking and CRM data close the loop from click to closed job.
In home services the creative is the campaign. We shoot real crews, real installs and real before/afters — scroll-stopping work that earns the click before a single dollar of targeting does the rest.
"Watch this 1996 furnace die"
Leads are a means, revenue is the metric. We optimize the whole chain to closed jobs and return on ad spend — because 200 cheap leads that never book are worth less than 20 that sign.
A great ad into a slow front desk leaks money. We own the whole path — ad, landing page, CRM, instant AI follow-up and booked appointment — so no lead falls through the cracks at 7pm on a Friday.
We're not a 30-day test you run and forget. We compound — learning your market, sharpening your offer and lowering your cost per job quarter after quarter. Most Green City clients stay for years, not months.
Eight principles, one promise — more booked jobs from the budget you already spend.
See the Green City difference applied to your market.
BOOK A STRATEGY CALLTell us about your business and we’ll map your full lead-to-revenue system on a free call — ads, creative, landing pages, CRM, AI follow-up and tracked revenue, built for your trade and your market. No commitment, and you keep the growth plan either way.
Thanks, there. We’ve got your details and a strategist will reach out within one business day to book your free call and map your growth plan.